Loading...
DPW Review Comments Memo 4-22-24 The Town of Barnstable Department of Public Works 382 Falmouth Road, Hyannis, MA 02601 508.790.6400 Daniel W. Santos, P.E. Robert R. Steen, P.E. Director Assistant Director MEMORANDUM To: Derek B. Redgate, P.E., Sr. Project Manager, Coastal Engineering Company, Inc. (now Tighe & Bond) From: Matthew J. Wrobel, P.E., Senior Project Manager Cc: Griffin Beaudoin, P.E., Town Engineer Date: April 22, 2024 Subject: TOB DPW Engineering Department Review of Preliminary Subdivision Plan Preliminary Subdivision Plan Review The Town of Barnstable DPW Engineering Department has completed the requested review of the Preliminary Subdivision Form B submission, Environmental Analysis Form, and Preliminary Subdivision Plan titled “201 MAIN STREET PRELIMINARY PLAN IN HYANNIS, MASSACHUSETTS (BARNSTABLE COUNTY)” Prepared by Coastal Engineering Company, Inc. (now Tighe & Bond) and dated 4-9-2024. The aforementioned documents were reviewed for compliance with the Town of Barnstable Planning Board Subdivision Regulations, and the following discrepancies between the regulations and submitted documents are listed below. · Sections D, E, and F of the Environmental Analysis Form are incomplete. · The Professional Engineer’s stamps on sheets G-101, C-101, and C-102 do not include the date of stamping. · The zoning tables on sheets G-101 and C-101 do not include the overlay district listed in the zoning classification table on sheet V-101, and the zoning districts also do not match between tables. · Roadway classifications are not provided. · Sight Distances are not provided for the intersection of Main Street and proposed Road A. TOB DPW Engineering Department Review of Preliminary Subdivision Plan April 22, 2024 Page 2 · The drainage easement should also be assigned a lot number. · The existing conditions plan does not depict any existing drainage systems, and systems should be depicted if present. · Existing water lines within the preliminary subdivision are not shown between buildings, only to the 2-story office building and 2 story motel building. · Remove the proposed sewer connection on Main Street and re-use the existing sewer connection located on School Street (see attached tie card pdf). · Relocate the proposed sewer stub for Lot 2 so that it does not require an easement to cross Lot 3. · Provide a water service to lot 2 and depict gas and electric utility connections for lots 1, 2, and 3. · The proposed roadway curbing, and sidewalk should connect to the existing curbing and sidewalk along Main Street. Roadway stationing should also be adjusted to begin at the existing curb on Main Street. · Lots 2 and 3 do not appear to meet the Lot Shape factor threshold of 22. Before the preliminary plan, Environmental Analysis Form, and Form B application submittals can be accepted the discrepancies noted must be corrected. Please make the requested plan and application changes and then resubmit for additional review.