Loading...
2-24-2023 -Parker Lane - DPW Review - Comments Memo 2-24-23 The Town of Barnstable Department of Public Works 382 Falmouth Road, Hyannis, MA 02601 508.790.6400 Daniel W. Santos, P.E. Robert R. Steen, P.E. Director Assistant Director MEMORANDUM To: Frank Gallagher, P.E., Gallagher Engineering From: Griffin Beaudoin, P.E., Town Engineer Date: February 24, 2023 Subject: Review Comments for Revised Submittal of Definitive Subdivision on Old Stage Road & Parker Lane in Barnstable, MA dated February 23, 2023 In review of the revised Site Plan Review Subdivision package submitted on February 23, 2023, the following comments apply: 1) Provide a response letter addressing how all comments from prior review memorandums have been addressed. 2) Provide an additional catch basin in the proposed swale at Station 3+00. This new catch basin should be connected to the proposed infiltration structures. 3) Provide a depression and/or berm at the proposed catch basin adjacent to Service Road to prevent stormwater from bypassing the catch basin and draining onto Service Road. 4) “Beehive” style grates should be specified for the catch basins located in swales.