Loading...
Certificate of Appropriateness Town of Barnstable Old King's Highway Historic District Committee SARNWAOLL : 367 Main Street, Hyannis,Massachusetts 02601 byy, t� Telephone(508)862-4787, Email grayce.roger Atown.barnstable.ma.L:s �w r�F APPLICATION FOR CERTIFICATE OF APPROPRIATENESS Application is hereby made,with six(6)complete,colored sets,for the issuance of a Certificate of Appropriateness under Section 6 of Chapter 470, Acts and Resolves of Massachusetts, 1973, for proposed work as described below and on plans, drawings, or photographs accompanying this application for: - ---....---•---------------------- , Date 05/04/2022 Date Built: 1914 Map&Parcel ; Property Owner Tess Korkuch Phone (508)566-3285 Street address 115 Commerce Road Email tskorkuch@verizon.net Village Mailing address 115 Commerce Road, Barnstable, MA Signature See attached Agent/Contractor rJunior Phone (508)291-0007 Agent Address 20 Patterson Brook Rd Unit 1 Wareham, MA 02576 Email permits.wareham@trinity-solar.com Agent Signature If approved, the Certificate of Appropriateness expires one year from the stamped approval date or upon the expiration of a Building Permit, whichever date shall be later. A one year extension may be requested, in writing, to the Old King's Highway Administrative Assistant at 367 Main Street,Hyannis,MA 02601.This request must be received prior to the date of expiration. There is a 10 day appeal period plus a four day waiting period for all applications after which time your approval paperwork will be available for pickup and building permit sign-off.All applications are subject to meeting any applicable building code requirements. Check all categories that apply Building Construction C New Build F� Addition ❑ Alteration Residential Commercial Type of Building 1:71 House F-1 Garage ❑ Barn ❑ Shed Other Project ❑ Roof E7Windows/Doors ❑ Siding/Painting Solar Other Landscape Feature Fence Wall Flag Pole Pool Other Sign New Sign Replace Sign Repaint Sign Other Description of Proposed Work Install 3.20kw solar panels on roof. Will not exceed roof panel, but will add 6"to roof height. 8 total panels (located on back of home on R2 and R8). for Committee use only This Certificate is hereby APPROVED DENIED By a vote o Ave Nay Abstain Date Conditions of Approval Barnstable, MA April 22, 2022 Town of Barnstable200 Main Street Hyannis, MA 02601 Trinity Solar No. 115 Commerce Road 2022-03-682683 Barnstable, MA 02630 Trinity Solar | 20 Patterson Brook Rd, Unit 10 | West Wareham, MA | (508) 291-0007 MA License No. 56687 RE: KORKUCH, TESS T To the Building Official: The following information constitutes a summary of the relevant design criteria and recommendations for the support of a new photovoltaic [PV] system on the existing roof framing components at the above-referenced location. Criteria is as follows: 1. Existing roof framing: Conventional roof framing at R2 is 2x6 at 24 o.c.; existing rafter span= 12' 0" with an existing kneewall at approximately mid-rafter span; (horizontal projection) Conventional roof framing at R8 is 2x6 at 24 o.c.; existing rafter span= 5' 0"; (horizontal projection) 2. Roof Loading: • 3.0psf dead load (pounds per square foot - PV panels, mounting rails & hardware) • 5.7psf - existing roof loads (1.7 psf - 2x6 framing, 1.5psf roof sheathing, 2.5 psf shingles) • Ground Snow Load - 30psf - per ASCE Hazard Tool • Wind criteria - Exposure Category B, 140 mph wind 3. Existing Roof modification - none required; existing roof framing is acceptable for PV installation. This installation design is in general conformance with the manufacturers’ specifications and complies with all applicable laws, codes, and ordinances – specifically the International Building Code (2015 edition) and the International Residential Code (2015 edition), including all Massachusetts regulations and amendments. The spacing and fastening of the mounting brackets is a maximum of 48” o.c. between mounting brackets (staggered) and is secured using 5/16” diameter corrosive-resistant steel lag bolts. A minimum of 2½” of penetration (embedment) per lag bolt is required, which will resist all stated loads above – including wind shear. Per NDS Section 12.1.4, clearance holes - equal to the diameter of the shank - need to be bored into a primary framing member for the full-length of the threaded portion of the bolt to avoid splitting of the framing member. Regards, Ihor Bojcun, PE Structural Engineer - Trinity Solar fs 1 < _ li 1 1 5 L - y k .r zr - i {^ S 77777 s s c Y cz:'�'.`-V . ..C,,,y�g`,x _ y r" .r 2 "�r �^, � Y .�i''"�'5,--.,�. $ ,� a,x,. �'�a`'�y- tR•a, s �c ��_3reF 4�£� ' x' �� v -'? -} �s.� � rye;...+ k•„y_ '' ,�Jam;'fi ,-, ;��.��. ._, z �� ���� '�bbv....,3 c���> mow,.-i^.�'�g-�. � : ism- - �-� _ ,moi-` `a. fY W Ws3�� V• ''�,' '� ii 11 y- a n• r. 6 I� k �����rr�����yp�pyJyi Y.a• 1 b 1�•�'•� A0. Y _ err i mom IIS al ���� ■ v! .v_ - p Y II f I4' n u t I I� P ti2P�1�-��i7 - I NNNa ��NN�� �NNNNNNNN�NN � iNNNNNNNNEl ■ � �� � NNN F- 7 ,- 5` ME `- IzzI711 - M4 - - - .jr i iL J Y. 1 }1 IC I 1 ,i f I P � � w a. i .7 1 3 III WIN I X A34� Ai n■rnn own NOUN _ ■■�nnvn n�nnnnn�■ �wnn �nn■n �► AMod".- WON w g 6F d' 1F INSTALLATION OF NEW ROOF MOUNTED PV SOLAR SYSTEM 115 COMMERCE ROAD BARNSTABLE, MA 02630 41.707120,-70.294141 COMMERCE ROAD R1 SITE ELEVATIONS 4/28/2022 P1 ISSUED TO TOWNSHIP FOR PERMIT 4/20/2022 NO.DESCRIPTION DATE KORKUCH, TESS- TRINITY ACCT #: 2022-03-682683 115 COMMERCE ROAD BARNSTABLE, MA 02630 41.707120,-70.294141 PROPOSED PV SOLAR SYSTEM DRAWING DATE:4/20/2022 DRAWN BY:RG REVISED BY:FJ DC SYSTEM SIZE:3.2kW AC SYSTEM SIZE:3kW MODULE COUNT:8 MODULES USED:HANWHA 400 MODULE SPEC #:Q.PEAK DUO BLK ML-G10.a+ 400 UTILITY COMPANY:EVERSOURCE UTILITY ACCT #:14545870017 UTILITY METER #:2302578 DEAL TYPE:SUNNOVA R1 VICINITY MAP SCALE: NTS Project Title: System Information: Drawing Information Rev. No.Sheet Issued / Revisions Project Address: Drawing Title: PV - 1 SITE GENERAL NOTES IF ISSUED DRAWING IS MARKED WITH A REVISION CHARACTER OTHER THAN "A", PLEASE BE ADVISED THAT FINAL EQUIPMENT AND/OR SYSTEM CHARACTERISTICS ARE SUBJECT TO CHANGE DUE TO AVAILABLITY OF EQUIPMENT. GENERAL NOTES CONTINUED 14. B)CURRENT PREVAILING UTILITY COMPANY SPECIFICATIONS, STANDARDS, AND REQUIREMENTS 15 THIS SET OF PLANS HAVE BEEN PREPARED FOR THE PURPOSE OF MUNICIPAL AND AGENCY REVIEW AND APPROVAL. ONCE APPROVED, THE INSTALLATION CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL SYSTEM COMPONENTS AS DESCRIBED IN THE DRAWING PACKAGE. 16 ALL INFORMATION SHOWN MUST BE CERTIFIED PRIOR TO USE FOR CONSTRUCTION ACTIVITIES. AMPERE ALTERNATING CURRENT ALUMINUM AMP. FRAME ABOVE FINISHED FLOOR ABOVE FINISHED GRADE AMERICAN WIRE GAUGE CONDUIT (GENERIC TERM OF RACEWAY, PROVIDE AS SPECIFIED) COMBINER BOX CIRCUIT CURRENT TRANSFORMER COPPER DIRECT CURRENT DISCONNECT SWITCH DRAWING ELECTRICAL SYSTEM INSTALLER ELECTRICAL METALLIC TUBING FUSIBLE SWITCH FUSE GROUND GROUND FAULT INTERRUPTER FREQUENCY (CYCLES PER SECOND) AMP AC AL AF AFF AFG AWG C CB CKT CT CU DC DISC DWG EC EMT FS FU GND GFI HZ ABBREVIATIONS JUNCTION BOX THOUSAND CIRCULAR MILS KILO-VOLT AMPERE KILO-WATT KILO-WATT HOUR LINE MAIN CIRCUIT BREAKER MAIN DISTRIBUTION PANEL MAIN LUG ONLY MOUNTED MOUNTING NEUTRAL NATIONAL ELECTRICAL CODE NOT IN CONTRACT NUMBER NOT TO SCALE OVER CURRENT PROTECTION POLE PULL BOX PHASE POLY-VINYL CHLORIDE CONDUIT POWER QUANTITY RIGID GALVANIZED STEEL SOLID NEUTRAL SWITCHBOARD TYPICAL UNLESS OTHERWISE INDICATED WEATHERPROOF TRANSFORMER MOUNT 72 INCHES TO BOTTOM OF ABOVE FINISHED FLOOR OR GRADE JB kCMIL kVA kW kWH L MCB MDP MLO MTD MTG N NEC NIC NO # NTS OCP P PB PH Ø PVC PWR QTY RGS SN JSWBD TYP U.O.I. WP XFMR +72 ABBREVIATIONS CONTINUEDGENERAL NOTES 1.THE INSTALLATION CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EQUIPMENT AND FOLLOWING ALL DIRECTIONS AND INSTRUCTIONS CONTAINED IN THE DRAWING PACKAGE AND INFORMATION RECEIVED FROM TRINITY. 2.THE INSTALLATION CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EQUIPMENT AND FOLLOWING ALL DIRECTIONS AND INSTRUCTION CONTAINED IN THE COMPLETE MANUAL. 3.THE INSTALLATION CONTRACTOR IS RESPONSIBLE FOR READING AND UNDERSTANDING ALL DRAWINGS, COMPONENT AND INVERTER MANUALS PRIOR TO INSTALLATION. THE INSTALLATION CONTRACTOR IS ALSO REQUIRED TO HAVE ALL COMPONENT SWITCHES IN THE OFF POSITION AND FUSES REMOVED PRIOR TO THE INSTALLATION OF ALL FUSE BEARING SYSTEM COMPONENTS. 4.ONCE THE PHOTOVOLTAIC MODULES ARE MOUNTED, THE INSTALLATION CONTRACTOR SHOULD HAVE A MINIMUM OF ONE ELECTRICIAN WHO HAS ATTENDED A SOLAR PHOTOVOLTAIC INSTALLATION COURSE ON SITE. 5.FOR SAFETY, IT IS RECOMMENDED THAT THE INSTALLATION CREW ALWAYS HAVE A MINIMUM OF TWO PERSONS WORKING TOGETHER AND THAT EACH OF THE INSTALLATION CREW MEMBERS BE TRAINED IN FIRST AID AND CPR. 6.THIS SOLAR PHOTOVOLTAIC SYSTEM IS TO BE INSTALLED FOLLOWING THE CONVENTIONS OF THE NATIONAL ELECTRICAL CODE. ANY LOCAL CODE WHICH MAY SUPERSEDE THE NEC SHALL GOVERN. 7.ALL SYSTEM COMPONENTS TO BE INSTALLED WITH THIS SYSTEM ARE TO BE "UL" LISTED. ALL EQUIPMENT WILL BE NEMA 3R OUTDOOR RATED UNLESS INDOORS. GENERAL NOTES CONTINUED 8.THE DC VOLTAGE FROM THE PANELS IS ALWAYS PRESENT AT THE DC DISCONNECT ENCLOSURE AND THE DC TERMINALS OF THE INVERTER DURING DAYLIGHT HOURS. ALL PERSONS WORKING ON OR INVOLVED WITH THE PHOTOVOLTAIC SYSTEM ARE WARNED THAT THE SOLAR MODULES ARE ENERGIZED WHENEVER THEY ARE EXPOSED TO LIGHT. 9.ALL PORTIONS OF THIS SOLAR PHOTOVOLTAIC SYSTEM SHALL BE MARKED CLEARLY IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE ARTICLE 690 & 705. 10.PRIOR TO THE INSTALLATION OF THIS PHOTOVOLTAIC SYSTEM, THE INSTALLATION CONTRACTOR SHALL ATTEND A PRE-INSTALLTION MEETING FOR THE REVIEW OF THE INSTALLATION PROCEDURES, SCHEDULES, SAFETY AND COORDINATION. 11.PRIOR TO THE SYSTEM START UP THE INSTALLATION CONTRACTOR SHALL ASSIST IN PERFORMING ALL INITIAL HARDWARE CHECKS AND DC WIRING CONDUCTIVITY CHECKS. 12.FOR THE PROPER MAINTENANCE AND ISOLATION OF THE INVERTERS REFER TO THE ISOLATION PROCEDURES IN THE OPERATION MANUAL. 13.THE LOCATION OF PROPOSED ELECTRIC AND TELEPHONE UTILITIES ARE SUBJECT TO FINAL APPROVAL OF THE APPROPRIATE UTILITY COMPANIES AND OWNERS. 14.ALL MATERIALS, WORKMANSHIP AND CONSTRUCTION FOR THE SITE IMPROVEMENTS SHOWN HEREIN SHALL BE IN ACCORDANCE WITH: A)CURRENT PREVAILING MUNICIPAL AND/OR COUNTY SPECIFICATIONS, STANDARDS AND REQUIREMENTS SHEET INDEX COVER SHEET W/ SITE INFO & NOTES ROOF PLAN W/ MODULE LOCATIONS ELEVATION DRAWINGS ELEVATION DRAWINGS ELECTRICAL 3 LINE DIAGRAM APPENDIX PV-1 PV-2 PV-3 PV-4 PV-5 AP R 2211 Allenwood Road Wall, New Jersey 07719 877-786-7283 www.Trinity-Solar.com ROOF 1 MODULES: 0 PITCH: 30° ORIENTATION: 278° ROOF 2 MODULES: 6 PITCH: 26 ORIENTATION: 98 ROOF 3 MODULES: 0 PITCH: 23° ORIENTATION: 95° ROOF 4 MODULES: 0 PITCH: 23° ORIENTATION: 275° ROOF 5 MODULES: 0 PITCH: 30° ORIENTATION: 188° ROOF 6 MODULES: 0 PITCH: 45° ORIENTATION: 188° ROOF 7 MODULES: 0 PITCH: 45° ORIENTATION: 8° ROOF 8 MODULES: 2 PITCH: 30 ORIENTATION: 98 ROOF 9 MODULES: 0 PITCH: 30° ORIENTATION: 98° ROOF 10 MODULES: 0 PITCH: 23° ORIENTATION: 90° ROOF 11 MODULES: 0 PITCH: 23° ORIENTATION: 270° R7 R1 R5 R8 R9 R2 R6 FRONT BACK epM P ***NOTE: SMART METER TO BE LOCATED <10' FROM UTILITY METER UD DC AC N S270 9013522545 31520'-1"SOLAR MODULES SHALL NOT EXCEED PEAK HEIGHT. HEIGHT FROM GROUND LEVEL TO PEAK OF ROOF SCALE: NOT TO SCALE ATTACHMENT & CLIP DETAIL SCALE: NOT TO SCALE 6"MAXSOLAR MODULE EXISTING RAFTER (REFER TO ENGINEERS LETTER FOR SPECS) ECOFASTEN "L" FOOT (REFER TO SPEC SHEET FOR DETAILS) SOLAR MODULE ECOFASTEN CLAMP (REFER TO SPEC SHEET FOR DETAILS) PV MODULE ATTACHMENT ON ASPHALT SHINGLE ROOF SCALE: NOT TO SCALE APOC SEALANT EXISTING ASPHALT SHINGLES (REFER TO ENGINEERS LETTER FOR SPECS) S.S. LAG BOLT (REFER TO ENGINEERS LETTER FOR SPECS) ECOFASTEN FLASHING (REFER TO SPEC SHEET FOR DETAILS) ECOFASTEN RAIL (REFER TO SPEC SHEET FOR DETAILS) NEW PV SOLAR MODULE, TYPICAL (REFER TO EQUIPMENT SCHEDULE FOR SPECS AND QUANTITIES) NEW ECOFASTEN RAIL,TYPICAL TO BE MOUNTED PERPINDICULAR TO STRUCTURE(REFER TO ECOFASTEN SPECIFICATION / DATA SHEET FOR DETAILS ) NEW MOUNTING FOOT/ ATTACHMENT POINTS, TYPICAL (REFER TO ENGINEERING LETTER FOR SPACING AND DETAILS) NEW END CLIP, TYPICAL (REFER TO ECOFASTEN SPECIFICATION / DATA SHEET FOR DETAILS ) NEW MID CLIP, TYPICAL (REFER TO ECOFASTEN SPECIFICATION / DATA SHEET FOR DETAILS ) NOTES : *REFER TO MODULE SPECS FOR MODULE DIMENSIONS *DEPICTED MODULES MAY BE PORTRAIT OR LANDSCAPE 41.707120,-70.294141 8 HANWHA 400 (Q.PEAK DUO BLK ML-G10.a+ 400) 1 SE3000H-US0SHBNC4 INDICATES NEW PRODUCTION METER TO BE INSTALLED INDICATES NEW INVERTER TO BE INSTALLED REFER TO EQUIPMENT SCHEDULE FOR SPECS INDICATES EXISTING ELECTRICAL PANEL LOCATION: INSIDE OUTSIDE. OUTSIDE (UTILITY ACCESSIBLE)OUTSIDE. R1 SITE ELEVATIONS 4/28/2022 P1 ISSUED TO TOWNSHIP FOR PERMIT 4/20/2022 NO.DESCRIPTION DATE KORKUCH, TESS- TRINITY ACCT #: 2022-03-682683 115 COMMERCE ROAD BARNSTABLE, MA 02630 41.707120,-70.294141 PROPOSED PV SOLAR SYSTEM DRAWING DATE:4/20/2022 DRAWN BY:RG REVISED BY:FJ DC SYSTEM SIZE:3.2kW AC SYSTEM SIZE:3kW MODULE COUNT:8 MODULES USED:HANWHA 400 MODULE SPEC #:Q.PEAK DUO BLK ML-G10.a+ 400 UTILITY COMPANY:EVERSOURCE UTILITY ACCT #:14545870017 UTILITY METER #:2302578 DEAL TYPE:SUNNOVA R1 Project Title: System Information: Drawing Information Rev. No.Sheet Issued / Revisions Project Address: Drawing Title: PV - 2 NOTES: 1.) ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 2.) ARRAY BONDING TO COMPLY WITH MANUFACTURER SPECIFICATION. 3.) ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION. 4.)AN AC DISCONNECT SHALL BE GROUPED WITH INVERTER(S )NEC 690.13(E). 5.)ALL OUTDOOR EQUIPMENT SHALL BE RAIN TIGHT WITH MINIMUM NEMA 3R RATING. 6.)ROOFTOP SOLAR INSTALLATION ONLY PV ARRAY SHALL NOT EXTEND BEYOND THE EXISTING ROOF EDGE. SYMBOL LEGEND EQUIPMENT SCHEDULE QTY SPEC # EQUIPMENT SCHEDULE ARRAY SCHEDULE PLUMBING SCHEDULE OTHER OBSTRUCTIONS M UD INDICATES EXISTING METER LOCATION INDICATES ROOF DESIGNATION . REFER TO ARRAY SCHEDULE FOR MORE INFORMATION INDICATES NEW PV SOLAR MODULE. RED MODULES INDICATE PANELS THAT USE MICRO INVERTERS. REFER TO EQUIPMENT SCHEDULE FOR SPECS. R1 SP INDICATES NEW PV ONLY SUBPANEL TO BE INSTALLED INDICATES NEW UNFUSED PV DISCONNECT TO BE INSTALLED OUTSIDE (UTILITY ACCESSIBLE ) P DC AC ep D INDICATES NEW FUSED PV DISCONNECT TO BE INSTALLED DC INDICATES NEW DC DISCONNECT R 2211 Allenwood Road Wall, New Jersey 07719 877-786-7283 www.Trinity-Solar.com SD INDICATES EXISTING SERVICE DISCONNECT TS INDICATES EXISTING TRANSFER SWITCH (PROPERTY LINE )FRONT BACK 1'-1 1/16"8'-6 5/8"6'-10 13/16"1ST FL. APPROX. GRADE ATTIC TOP OF PEAK 1'-1 1/16"8'-6 5/8"6'-10 13/16"1ST FL. APPROX. GRADE ATTIC TOP OF PEAK CONDUIT RUN EXISTING ELECTRIC PANEL LOCATED INSIDE HOUSE EXISTING METER LOCATED INSIDE***NOTE:PV DISCONNECT TO BE INSTALLED <6'-7" TO CENTER OF HANDLE (NEC 404.8)PROPOSED PV AC DISCONNECT LOCATED OUTSIDE PROPOSED INVERTER LOCATED OUTSIDE (REFER TO S-001 FOR SPECS) R1 SITE ELEVATIONS 4/28/2022 P1 ISSUED TO TOWNSHIP FOR PERMIT 4/20/2022 NO.DESCRIPTION DATE KORKUCH, TESS- TRINITY ACCT #: 2022-03-682683 115 COMMERCE ROAD BARNSTABLE, MA 02630 41.707120,-70.294141 PROPOSED PV SOLAR SYSTEM DRAWING DATE:4/20/2022 DRAWN BY:RG REVISED BY:FJ DC SYSTEM SIZE:3.2kW AC SYSTEM SIZE:3kW MODULE COUNT:8 MODULES USED:HANWHA 400 MODULE SPEC #:Q.PEAK DUO BLK ML-G10.a+ 400 UTILITY COMPANY:EVERSOURCE UTILITY ACCT #:14545870017 UTILITY METER #:2302578 DEAL TYPE:SUNNOVA R1 2211 Allenwood Road Wall, New Jersey 07719 R 877-797-2978 www.Trinity-Solar.com EAST ELEVATION SCALE: 1/8"=1'-0" WEST ELEVATION SCALE: 1/8"=1'-0" NYC DEPT OF BUILDING APPROVAL STAMP PLAN NOTES 1.SCOPE OF WORK IS SOLEY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THE DOB Project Title: System Information: Drawing Information Rev. No.Sheet Issued / Revisions Project Address: Drawing Title: PV - 3 1'-1 1/16"8'-6 5/8"6'-10 13/16"1ST FL. APPROX. GRADE ATTIC TOP OF PEAK 1'-1 1/16"8'-6 5/8"6'-10 13/16"1ST FL. APPROX. GRADE ATTIC TOP OF PEAK R1 SITE ELEVATIONS 4/28/2022 P1 ISSUED TO TOWNSHIP FOR PERMIT 4/20/2022 NO.DESCRIPTION DATE KORKUCH, TESS- TRINITY ACCT #: 2022-03-682683 115 COMMERCE ROAD BARNSTABLE, MA 02630 41.707120,-70.294141 PROPOSED PV SOLAR SYSTEM DRAWING DATE:4/20/2022 DRAWN BY:RG REVISED BY:FJ DC SYSTEM SIZE:3.2kW AC SYSTEM SIZE:3kW MODULE COUNT:8 MODULES USED:HANWHA 400 MODULE SPEC #:Q.PEAK DUO BLK ML-G10.a+ 400 UTILITY COMPANY:EVERSOURCE UTILITY ACCT #:14545870017 UTILITY METER #:2302578 DEAL TYPE:SUNNOVA R1 2211 Allenwood Road Wall, New Jersey 07719 R 877-797-2978 www.Trinity-Solar.com SOUTH ELEVATION SCALE: 1/8"=1'-0" NORTH ELEVATION SCALE: 1/8"=1'-0" NYC DEPT OF BUILDING APPROVAL STAMP PLAN NOTES 1.SCOPE OF WORK IS SOLEY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THE DOB Project Title: System Information: Drawing Information Rev. No.Sheet Issued / Revisions Project Address: Drawing Title: PV - 4 CALCULATIONS FOR CURRENT CARRYING CONDUCTORS REQUIRED CONDUCTOR AMPACITY PER STRING [NEC 690.8(B)(1)]: (15.00*1.25)1 = 18.75A AWG #10, DERATED AMPACITY AMBIENT TEMP: 33°C, TEMP DERATING FACTOR: .96 RACEWAY DERATING = 2 CCC: 1.00 (40*.96)1.00 = 38.40A 38.40A >_ 18.75A, THEREFORE WIRE SIZE IS VALID TOTAL AC REQUIRED CONDUCTOR AMPACITY 12.50A*1.25 = 15.63A AWG #10, DERATED AMPACITY AMBIENT TEMP: 30°C, TEMP DERATING: 1.0 RACEWAY DERATING <_ 3 CCC: N/A 40A*1.0 = 40A 40A >_ 15.63A, THEREFORE AC WIRE SIZE IS VALID CALCULATION FOR PV OVERCURRENT PROTECTION TOTAL INVERTER CURRENT: 12.50A 12.50A*1.25 = 15.63A --> 20A OVERCURRENT PROTECTION IS VALID ARRAY CIRCUIT WIRING NOTES 1.) LICENSED ELECTRICIAN ASSUMES ALL RESPONSIBILITY FOR DETERMINING ONSITE CONDITIONS AND EXECUTING INSTALLATION IN ACCORDANCE WITH NEC 2020 2.) LOWEST EXPECTED AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP = -16°C 3.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMP = 33°C 4.) 2005 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47°C IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1°C). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN A ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47°C OR LESS (ALL OF UNITED STATES) 5.) PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN FUNCTION THAT CONTROLS SPECIFIC CONDUCTORS IN ACCORDANCE WITH NEC 690.12(A) THROUGH (D) 6.) PHOTOVOLTAIC POWER SYSTEMS SHALL BE PERMITTED TO OPERATE WITH UNGROUNDED PHOTOVOLTAIC SOURCE AND OUTPUT CIRCUIT AS PER NEC 690.41 (A)(4) 7.) UNGROUNDED DC CIRCUIT CONDUCTORS SHALL BE IDENTIFIED WITH THE FOLLOWING OUTER FINISH: POSITIVE CONDUCTORS = RED NEGATIVE CONDUCTORS = BLACK NEC 210.5(C)(2) 8.) ARRAY AND SUB ARRAY CONDUCTORS SHALL BE #10 PV WIRE TYPE RHW-2 OR EQUIVELANT AND SHALL BE PROTECTED BY CONDUIT WHERE EXPOSED TO DIRECT SUNLIGHT. SUB ARRAY CONDUIT LONGER THAN 24” SHALL CONTAIN ≤ 20 CURRENT CARYING CONDUCTORS AND WHERE EXPOSED TO DIRECT SUNLIGHT SHALL CONTAIN ≤ 9 CURRENT CARRYING CONDUCTORS. 9.) ALL WIRE LENGTHS SHALL BE LESS THAN 100' UNLESS OTHERWISE NOTED 10.) FLEXIBLE CONDUIT SHALL NOT BE INSTALLED ON ROOFTOP AND SHALL BE LIMITED TO 12” IF USED OUTDOORS 11.)OVERCURRENT PROTECTION FOR CONDUCTORS CONNECTED TO THE SUPPLY SIDE OF A SERVICE SHALL BE LOCATED WITHIN 10' OF THE POINT OF CONNECTION NEC 690.9(A)(3)(2) 12.) WHERE TWO SOURCES FEED A BUSSBAR, ONE A UTILITY AND THE OTHER AN INVERTER, PV BACKFEED BREAKER(S) SHALL BE LOCATED OPPOSITE FROM UTILITY NEC 705.12(B)(3)(2) 13.) ALL SOLAR SYSTEM LOAD CENTERS TO CONTAIN ONLY GENERATION CIRCUITS AND NO UNUSED POSITIONS OR LOADS 14.) ALL EQUIPMENT INSTALLED OUTDOORS SHALL HAVE A NEMA 3R RATING EXISTING MAIN BREAKER LOAD CENTER 2p20A BACK FEED BREAKER NEC 705.12(B)NEUTRALM 2p100AMAIN240V 1Ø 100A MAIN BREAKER 100A BUSBAR EXISTING 1Ø 120/240V UTILITY METER E SQUARE D DU222RB 60A UNFUSED DISCONNECT ISOLATED NEUTRAL 240V 1Ø BB NOTE: INTERNAL REVENUE GRADE MONITORING CONTAINED WITHIN SOLAR EDGE INVERTER SOLAR EDGE PN. RWND-3D-240-MB SMART METER PRODUCTION METER M ISOLATED NEUTRAL LINE SIDE LOAD SIDE INVERTER #1 - SE3000H-US0SHBNC4 DC AC Imp 8.42 Pout 3000 Vmp 380 Imax 12.5 Voc 480 OCPDmin 15.63 Isc 15 Vnom 240 PV MODULE SPECIFICATIONS HANWHA 400 (Q.PEAK DUO BLK ML-G10.a+ 400) Imp 10.77 Vmp 37.13 Voc 45.3 Isc 11.14 A #6 THWN-2 GEC TO EXISTING GROUND ROD B 3/4'' CONDUIT W/ 2-#10 THWN-2, 1-#10 THWN-2, 1-#10 THWN-2 GROUND C 3/4'' CONDUIT W/ 2-#10 THWN-2, 1-#10 THWN-2 GROUND D 3/4'' CONDUIT W/ 2-#10 THWN-2, 1-#10 THWN-2 GROUND E 3/4'' CONDUIT W/ 2-#10 THWN-2, 1-#10 THWN-2, 1-#10 THWN-2 GROUND F #10 PV WIRE (FREE AIR) W/ #6 BARE COPPER BOND TO ARRAY NOTE: CONDUIT TYPE SHALL BE CHOSEN BY THE INSTALLATION CONTRACTOR TO MEET OR EXCEED NEC AND LOCAL AHJD REQUIREMENTS INVERTER #1 PV+L1 L2 N PV-D SOLAR MODULES MOUNTED TO ROOF ON 2 ARRAYS 8 - 400W MODULES W/ 1 SOLAR EDGE P401 PER MODULE 15 ADC MAX PER STRING 1 STRING OF 8 MODULES IN SERIES - 380 Vmax *TERMINATED INSIDE INVERTER 1 f 8"x8" JUNCTION BOX R1 SITE ELEVATIONS 4/28/2022 P1 ISSUED TO TOWNSHIP FOR PERMIT 4/20/2022 NO.DESCRIPTION DATE KORKUCH, TESS- TRINITY ACCT #: 2022-03-682683 115 COMMERCE ROAD BARNSTABLE, MA 02630 41.707120,-70.294141 PROPOSED PV SOLAR SYSTEM DRAWING DATE:4/20/2022 DRAWN BY:RG REVISED BY:FJ DC SYSTEM SIZE:3.2kW AC SYSTEM SIZE:3kW MODULE COUNT:8 MODULES USED:HANWHA 400 MODULE SPEC #:Q.PEAK DUO BLK ML-G10.a+ 400 UTILITY COMPANY:EVERSOURCE UTILITY ACCT #:14545870017 UTILITY METER #:2302578 DEAL TYPE:SUNNOVA R1 Project Title: System Information: Drawing Information Rev. No.Sheet Issued / Revisions Project Address: Drawing Title: PV - 5 Engineer / License Holder: R 2211 Allenwood Road Wall, New Jersey 07719 877-786-7283 www.Trinity-Solar.com